Search Preview
Permits • The City of Brewer, Maine
brewermaine.gov.gov > brewermaine.gov
SEO audit: Content analysis
Language | Error! No language localisation is found. | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Title | Permits • The City of Brewer, Maine | ||||||||||||||||||||||||||||||||||||
Text / HTML ratio | 12 % | ||||||||||||||||||||||||||||||||||||
Frame | Excellent! The website does not use iFrame solutions. | ||||||||||||||||||||||||||||||||||||
Flash | Excellent! The website does not have any flash contents. | ||||||||||||||||||||||||||||||||||||
Keywords cloud | Brewer City Code Permits Permit – Fee Enforcement Business replacement System Online Public Land Parks Library Disposal work Information Tax | ||||||||||||||||||||||||||||||||||||
Keywords consistency |
|
||||||||||||||||||||||||||||||||||||
Headings |
|
||||||||||||||||||||||||||||||||||||
Images | We found 5 images on this web page. |
SEO Keywords (Single)
Keyword | Occurrence | Density |
---|---|---|
Brewer | 23 | 1.15 % |
City | 12 | 0.60 % |
Code | 12 | 0.60 % |
Permits | 12 | 0.60 % |
Permit | 11 | 0.55 % |
– | 9 | 0.45 % |
Fee | 9 | 0.45 % |
Enforcement | 9 | 0.45 % |
Business | 9 | 0.45 % |
replacement | 8 | 0.40 % |
System | 7 | 0.35 % |
Online | 6 | 0.30 % |
Public | 6 | 0.30 % |
Land | 5 | 0.25 % |
Parks | 5 | 0.25 % |
Library | 5 | 0.25 % |
Disposal | 5 | 0.25 % |
work | 5 | 0.25 % |
Information | 5 | 0.25 % |
Tax | 5 | 0.25 % |
SEO Keywords (Two Word)
Keyword | Occurrence | Density |
---|---|---|
Code Enforcement | 9 | 0.45 % |
new or | 8 | 0.40 % |
or replacement | 7 | 0.35 % |
Permit – | 7 | 0.35 % |
of Brewer | 5 | 0.25 % |
cost of | 4 | 0.20 % |
– new | 4 | 0.20 % |
City of | 4 | 0.20 % |
of the | 4 | 0.20 % |
Parks Recreation | 3 | 0.15 % |
can be | 3 | 0.15 % |
a Business | 3 | 0.15 % |
Code Zoning | 3 | 0.15 % |
Use Code | 3 | 0.15 % |
Land Use | 3 | 0.15 % |
Site Plans | 3 | 0.15 % |
the work | 3 | 0.15 % |
Safety Museum | 3 | 0.15 % |
Public Safety | 3 | 0.15 % |
or alteration | 3 | 0.15 % |
SEO Keywords (Three Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
new or replacement | 7 | 0.35 % | No |
City of Brewer | 4 | 0.20 % | No |
Permit – new | 4 | 0.20 % | No |
Public Safety Museum | 3 | 0.15 % | No |
Land Use Code | 3 | 0.15 % | No |
Use Code Zoning | 3 | 0.15 % | No |
Plans Ordinances Land | 2 | 0.10 % | No |
Ordinances Boards Committees | 2 | 0.10 % | No |
Library Parks Recreation | 2 | 0.10 % | No |
Meetings Agendas and | 2 | 0.10 % | No |
Agendas and Minutes | 2 | 0.10 % | No |
and Minutes Ordinances | 2 | 0.10 % | No |
Minutes Ordinances Boards | 2 | 0.10 % | No |
Public Library Parks | 2 | 0.10 % | No |
Code Enforcement Permits | 2 | 0.10 % | No |
Codes Site Plans | 2 | 0.10 % | No |
Certificate of Occupancy | 2 | 0.10 % | No |
Brewer Public Library | 2 | 0.10 % | No |
Treatment Tank Only | 2 | 0.10 % | No |
Department Brewer Public | 2 | 0.10 % | No |
SEO Keywords (Four Word)
Keyword | Occurrence | Density | Possible Spam |
---|---|---|---|
Land Use Code Zoning | 3 | 0.15 % | No |
Permits Codes Site Plans | 2 | 0.10 % | No |
Development Police Department Brewer | 2 | 0.10 % | No |
and Minutes Ordinances Boards | 2 | 0.10 % | No |
Minutes Ordinances Boards Committees | 2 | 0.10 % | No |
Why Brewer? Starting or | 2 | 0.10 % | No |
a Business Business Assistance | 2 | 0.10 % | No |
City of Brewer Economic | 2 | 0.10 % | No |
of Brewer Economic Development | 2 | 0.10 % | No |
Brewer Economic Development Police | 2 | 0.10 % | No |
Economic Development Police Department | 2 | 0.10 % | No |
Department Brewer Public Library | 2 | 0.10 % | No |
Police Department Brewer Public | 2 | 0.10 % | No |
Meetings Agendas and Minutes | 2 | 0.10 % | No |
Brewer Public Library Parks | 2 | 0.10 % | No |
or Expanding a Business | 2 | 0.10 % | No |
Codes Site Plans Ordinances | 2 | 0.10 % | No |
Site Plans Ordinances Land | 2 | 0.10 % | No |
Plans Ordinances Land Use | 2 | 0.10 % | No |
Ordinances Land Use Code | 2 | 0.10 % | No |
Internal links in - brewermaine.gov
Departments • The City of Brewer, Maine
Assessing • The City of Brewer, Maine
Assessing Procedures • The City of Brewer, Maine
Commitment & Tax Records • The City of Brewer, Maine
Exemptions & Tax Relief Programs • The City of Brewer, Maine
GIS Maps • The City of Brewer, Maine
Tax Maps • The City of Brewer, Maine
City Clerk • The City of Brewer, Maine
City Council Meetings, Agendas, and Minutes • The City of Brewer, Maine
Ordinances • The City of Brewer, Maine
Boards & Committees • The City of Brewer, Maine
Licenses & Fee Schedule • The City of Brewer, Maine
Vital Records & Genealogy Research • The City of Brewer, Maine
City Manager • The City of Brewer, Maine
City Organizational Chart • The City of Brewer, Maine
Employment Opportunities • The City of Brewer, Maine
General Assistance • The City of Brewer, Maine
Community Development Program • The City of Brewer, Maine
City Hall Hours & Holiday Schedule • The City of Brewer, Maine
Code Enforcement • The City of Brewer, Maine
Permits • The City of Brewer, Maine
Codes • The City of Brewer, Maine
Site Plans • The City of Brewer, Maine
Land Use Code • The City of Brewer, Maine
Zoning • The City of Brewer, Maine
Economic Development • The City of Brewer, Maine
Why Brewer? • The City of Brewer, Maine
Starting or Expanding a Business • The City of Brewer, Maine
Business Assistance • The City of Brewer, Maine
Licensing & Permitting • The City of Brewer, Maine
Brewer Business Resources • The City of Brewer, Maine
Brewer Business Alliance • The City of Brewer, Maine
Engineering • The City of Brewer, Maine
Map & Reference Information • The City of Brewer, Maine
Posted Road Information • The City of Brewer, Maine
Street Light Conversion • The City of Brewer, Maine
Environmental Services • The City of Brewer, Maine
Water Pollution Control Facility • The City of Brewer, Maine
WPCF Brochure • The City of Brewer, Maine
Solid Waste Programs • The City of Brewer, Maine
Sewer & Stormwater Collection Systems • The City of Brewer, Maine
Brewer Landfill • The City of Brewer, Maine
Finance • The City of Brewer, Maine
Online Services • The City of Brewer, Maine
Property Tax: Billing & Payment • The City of Brewer, Maine
Sewer/Water: Billing & Payment • The City of Brewer, Maine
Fish & Game Licenses • The City of Brewer, Maine
Dog Licenses • The City of Brewer, Maine
Yard Sale Permits • The City of Brewer, Maine
Bond Ratings & Audits • The City of Brewer, Maine
Financial Policies • The City of Brewer, Maine
Fire • The City of Brewer, Maine
Fire Prevention • The City of Brewer, Maine
Burn Permit • The City of Brewer, Maine
Public Safety Museum • The City of Brewer, Maine
Library • The City of Brewer, Maine
Library Cards & Circulation Policies • The City of Brewer, Maine
Passport Information • The City of Brewer, Maine
Programs • The City of Brewer, Maine
Parks & Recreation • The City of Brewer, Maine
Auditorium • The City of Brewer, Maine
Parks & Cemeteries • The City of Brewer, Maine
Seasonal Recreation • The City of Brewer, Maine
Planning • The City of Brewer, Maine
Comprehensive Plan • The City of Brewer, Maine
Brewer Land Trust • The City of Brewer, Maine
Impact Fees • The City of Brewer, Maine
State & Federal Permitting • The City of Brewer, Maine
Police • The City of Brewer, Maine
Divisions • The City of Brewer, Maine
FAQ • The City of Brewer, Maine
Mission & Vision • The City of Brewer, Maine
Public Works • The City of Brewer, Maine
Projects • The City of Brewer, Maine
Curbside Trash & Recycling Collection • The City of Brewer, Maine
Technology • The City of Brewer, Maine
Water • The City of Brewer, Maine
Customer Information & Application • The City of Brewer, Maine
Rates • The City of Brewer, Maine
Online Tax & Utility Payments • The City of Brewer, Maine
Consumer Confidence Reports • The City of Brewer, Maine
Testing Lab • The City of Brewer, Maine
Doing Business • The City of Brewer, Maine
Relocate a Business • The City of Brewer, Maine
Doing Business with Brewer & RFP’s • The City of Brewer, Maine
Community • The City of Brewer, Maine
News Archive • The City of Brewer, Maine
Brewer Farmers Market • The City of Brewer, Maine
Brewer History • The City of Brewer, Maine
Brewer Riverwalk • The City of Brewer, Maine
Community Connector / Bus • The City of Brewer, Maine
Places to Eat • The City of Brewer, Maine
Brewermaine.gov Spined HTML
Permits • The City of Brewer, Maine Skip to content Search Primary Menu Search Home Departments Assessing – GIS Assessing Procedures Property Values Online Database Commitment & Tax Records Exemptions & Tax Relief Programs GIS Maps Tax Maps City Clerk Meetings, Agendas, and Minutes Ordinances Boards & Committees Licenses & Fee Schedule Vital Records & Genealogy Research Register to Vote City Manager City Organizational Chart Employment Opportunities General Assistance Community Development Program City Hall Hours & Holiday ScheduleLawmakingEnforcement Permits Codes Site Plans Ordinances Land UseLawmakingZoning Economic Development Why Brewer? Starting or Expanding a Business Business Assistance Licensing & Permitting Brewer Business Resources Brewer Business Alliance Engineering Construction Project Updates Map & Reference Information Posted Road Information Street Light Conversion Environmental Services Water Pollution Control Facility WPCF Brochure Solid Waste Programs Sewer & Stormwater Collection Systems Brewer Landfill Finance Online Services Property Tax: Billing & Payment Sewer/Water: Billing & Payment Motor Vehicle Registration Boat, ATV, & Snowmobile Registration Fish & Game Licenses Dog Licenses Yard Sale Permits Bond Ratings & Audits Financial Policies Fire Fire Prevention Burn Permit Public Safety Museum Library Library Cards & Circulation Policies Online Catalog Digital Maine Library E-Books & Audio Downloads Passport Information Programs Parks & Recreation Auditorium Online Registration Parks & Cemeteries Seasonal Recreation Planning Comprehensive Plan Land UseLawmakingZoning Brewer Land Trust Site Plans Impact Fees State & Federal Permitting Police Divisions FAQ Mission & Vision Public Safety Museum Public Works Projects Winter Parking Rules Curbside Trash & Recycling Collection Brewer Landfill Technology Water Customer Information & Application Rates Online Tax & Utility Payments Consumer Confidence Reports Testing Lab Doing Business Why Brewer? Starting or Expanding a Business Relocate a Business Business Assistance Doing Business with Brewer & RFP’s Licensing & Permitting Community Brewer News Brewer Farmers Market Brewer History Brewer Historical Society Brewer Land Trust Brewer Riverwalk City Online Services Community Connector / Bus Parks & Cemeteries Performing Arts Center Places to Eat Public Safety Museum School Department Street Map Veterans Memorial City Council Meetings, Agendas, and Minutes Ordinances Boards & Committees Meet the City Councilors Contact Councilors Contact Follow City of Brewer Economic Development Police Department Brewer Public Library Parks & RecreationLawmakingEnforcement Subpages Permits Codes Site Plans Ordinances Land UseLawmakingZoningLawmakingEnforcement Personnel Contact Information Address: 80 North Main Street Brewer, ME 04412 Hours: 8:00AM – 4:00PM Telephone: 207.989.7790 Stewart M. BrooksLawmakingEnforcement Officer sbrooks@brewermaine.gov Home /LawmakingEnforcement / Permits Share Facebook Twitter E-mail Print Permits It is the goal of BrewerLawmakingEnforcement to help Brewer homeowners and businesses understand and meet the City of Brewer lawmaking requirements with the least possible inconvenience to the owner. TheLawmakingEnforcement Office issues the pursuit permits which are required surpassing the indicated work is started, including but not limited to:TowersPermit – new structure, expansion of an existing structure, structural repair or alteration, removing or subtracting a wall(s), waffly window or door sizes, fence installation, decks, towers demolition, or moving a building. Electrical Permit – new electrical wiring, new electrical equipment (except plug-in type equipment), or transubstantiation or wing to existing equipment or wiring. Oil Burner Permit – new or replacement oil burner, new or replacement fuel supply tank of ten gallons or more, new or replacement wood stove, or a new or replacement chimney. Plumbing Permit – new or replacement water distribution or drainage pipes, new or replacement hot water storage tank heater, relocation of pipes, valves, fixtures and drains, or new or replacement or transubstantiation of subsurface wastewater disposal system. Sewer Connection Permit – connection of new structure or expanding existing structure. Sign Permit – new, replacement or unsimilar sign. Street Opening Permit – digging in the street right-of-way. Filling and Grading: The City Engineer will inspect and legitimatize the issue of a filling and grading permit for 200 yards of fill or less. For fill and grading requiring increasingly than 200 yards, contactLawmakingEnforcement directly at 207.989.7790. The homeowner of a single-family dwelling can be issued all of the whilom permits provided that the homeowner unquestionably does the work. A contractor that is doing electrical, oil burner or plumbing work must be licensed for the trade, and the licensed contractor is responsible for getting the permit to well-constructed the work. The forfeit of any required permit is usually very small compared to the forfeit of the project, but the forfeit of NOT getting the necessary permits can be very large. Inspections are made at a mutually user-friendly time in order to ensure compliance with safety and technical standards. Zoning standards require property line setbacks for structures and moreover impose unrepealable use restrictions depending on the zone. It is highly recommended that you trammels the requirements for any major project well surpassing the work begins.Surpassinga new or renovated structure can be occupied, a Certificate of Occupancy is required from the BrewerLawmakingEnforcement Office.TowersPermits New Construction & Remodel of Existing Fee Finished Space $0.50 per square foot Unfinished Space $0.25 per square foot Minimum Permit Fee $50.00 Maximum Permit Fee $25,000.00 Electrical Permits Residential Fee Temporary Service $40.00 Change/Upgrade of Service $50.00Wingto Existing Wiring $40.00 New One & Two Family Dwellings $70.00 Commercial $70 minimum plus 1% of the total forfeit of the job Internal Plumbing Permits Fixture Fee Fee 1-4 Fixtures $40.00 Each spare fixture whilom four $10.00 All other internal plumbing permits $10.00 Subsurface Wastewater Disposal SystemsWell-constructedDisposal System Fee Engineered System (includes one disposal area) $200.00 Non-engineered System $250.00 Primitive System (includes one volitional toilet) $100.00 Separate Grey Water Disposal Field $35.00 Seasonal Conversion Permit $50.00 First-time System Variance $20.00 Permits for Separate Parts of Disposal Systems FeeVolitionalToilet (only) $50.00 Disposal Field Only $150.00 Treatment Tank Only (engineered system) $80.00 Treatment Tank Only (non-engineered system) $150.00 Holding Tank $100.00 Other System Component $30.00 Heating Permits All Heat System Types $50.00 Miscellaneous Permits Directional Sign $75.00 Street Opening $50.00 Certificate of Occupancy $50.00 All Other Permits $500.00 Brewer on Facebook City of Brewer Economic Development Police Department Brewer Public Library Parks & Recreation Close × Disclaimer Privacy Policy © 2018 The City of Brewer, Maine. All Rights Reserved.